Oil-immersed and dry-type transformers up to 35 kV manufactured by YINMA Electric in Wenzhou, China

China Transformer Manufacturer · YINMA Electric · Since 2008

Distribution and Power Transformers for Africa's Grid

Oil-immersed and dry-type transformers from 10 kVA to 31,500 kVA, 6 kV up to 38 kV, built to IEC 60076 — supplied to utilities, DISCOs, EPC contractors, mining and solar projects across Africa.

  • Capacity10 – 31,500 kVA
  • Voltage6 – 38 kV
  • StandardIEC 60076
  • Since2008

03 — Manufacturing

Step inside the shop.

Twenty stops around the floor. The wall turns by itself — hover or tap a frame and it swings to the centre.

Workshop floor
01

Workshop floor

Bushing fitting
02

Bushing fitting

Tank lineup
03

Tank lineup

Routine test
04

Routine test

Coil winding
05

Coil winding

Copper brazing
06

Copper brazing

Cover assembly
07

Cover assembly

Core & coil drop
08

Core & coil drop

Switchgear packing
09

Switchgear packing

Tank close-up
10

Tank close-up

Export loading
11

Export loading

Dry-type coils
12

Dry-type coils

Switchgear bay
13

Switchgear bay

Assembly hall
14

Assembly hall

Transport prep
15

Transport prep

Compact substation
16

Compact substation

Finished goods
17

Finished goods

Customer visit
18

Customer visit

Kiosk open view
19

Kiosk open view

Site installation
20

Site installation

Auto-rotating · hover to centre · tap on mobileBook a live video tour →

Why Choose Yinma Electric

End-to-end manufacturing, compliance, and project support for B2B buyers.

Rooted in China’s Electrical Capital

Our factory is in Yueqing, Zhejiang — the cluster behind much of China’s electrical equipment. With RMB 100 million in registered capital and a mature local supply chain, we control cost, lead time and component quality from one address.

60 Years of Family Engineering

A family business whose engineering team has built and repaired electrical equipment for six decades. That experience is why we diagnose site problems quickly — and why you can reach an engineer directly, at any time.

Every Certificate and Test Report

Routine and type test reports, CNAS certificates and third-party inspection are available for every unit. Delivery is inspected before dispatch, after-sales responds within one working day, and replacement parts are free within the warranty period.

Proven in Every Kind of Project

Mining, industrial plants, schools, residential estates, hospitals, office towers, hydropower stations, renewable energy plants and national grid projects — our distribution work already covers them all.

RMB 100M
Registered capital
60
Years of engineering
150,000 m²
Manufacturing base
30+
Export markets
Manufacturing Excellence

State-of-the-Art Transformer Production Facility

Our factory integrates core cutting, coil winding, vacuum drying, and full-load testing under one roof — ensuring every power transformer and distribution transformer meets international IEC standards before shipment.

  • 500+ MVA Annual Capacity
  • 15+ Years Experience
  • 40+ Countries Served
Tour Our Factory
State-of-the-art transformer factory production facility video

Frequently Asked Questions

Quick answers about our products, certifications, and delivery process.

What do you supply for African 11/33 kV projects?

Oil distribution transformers (typically 100–1,000 kVA at 11/0.4 and 33/0.4 kV), compact prefabricated substations with MV/LV switchgear, and dry-type units for indoor sites — for utilities, mines, EPCs, and commercial estates.

Will SONCAP / KEBS / SANS paperwork clear with the shipment?

Yes. Nigeria, Kenya, and South Africa deliveries include the conformity documents and serial-matched test reports ports actually check. Incomplete certificates are a top cause of Apapa/Mombasa delays — we treat docs as part of delivery, not an add-on.

How long from PO to arrival at Lagos, Mombasa, or Durban?

Plan roughly 8–14 weeks ex-factory after drawing approval, then ocean + clearance. Nigeria and South Africa often land around 10–14 weeks overall; Kenya around 8–12 weeks. Share your hard energization date early if you need an expedited slot.

Can one unit be ordered, or only tender batches?

Single catalog transformers and compact substations are fine — many African sites need one replacement now. Batch pricing still applies for rural or estate programs with identical units.

Ready to Power Your Next Project?

Tell us your voltage, capacity, and delivery requirements — our engineering team will respond within 24 hours with a tailored transformer proposal.

  • Free technical consultation
  • Custom engineering support
  • Local certification assistance
Technical parameters